The almost 5.5 million dollar project awarded to us by the City of Dollard-des-Ormeaux consisted of an extension to their existing community center. The city wanted a four-storey building, a wooden structure and a terrace on the roof. The work was to be performed while the building was occupied.
– Apparent wood structure
– Geothermal work
– Occupied premises
– Polished cement floor
Lump sum project
Ville de Dollard-des-Ormeaux
Dollard-des-Ormeaux
2016 - 2017
Héloïse Thibodeau Architecte Inc.
Bureau d’études spécialisées (BES)
Ville de Dollard-des-Ormeaux
Beaudoin Hurens