Construction of a new hotel with 124 luxurious rooms devided over 17 floors. The building includes 4 levels of underground parking, which are accessible by car hoist. There is also a swimming pool on the mezzanine, a two floors restaurant and a choice of exclusif finishing materials.
– Deep excavation ( 57 feet deep) with the Berlinese Wall
– Excavation adjacent to the subway (less then 12 ft)
– Raft containing 800m3 of concrete
– Deadline of 12 months from the concreting of the raft to the
official Opening
– Busy site in downtown Montreal and very limited space
– Day and Night construction shifts
Private project construction management
Jean Salette
Centre-ville de Montréal
2008 - 2010
Tremblay L'Écuyer Architectes
CLA
Blondin Fortin