document.getElementByClass("mkdf-ps-related-posts-title").innerHTML = "whatever";

Hypertec

Execution of 3 distinct projects simultaneously in 3 sections of the building including a 40,000 square foot extension and access to a new roof terrace.

Special features

Execution of project in 3 phases
– Phase 1: Construction of a new stairway for the RDC cafeteria on the third floor and a terrace on the roof.
– Phase 2: Construction of a new secondary entry and a drop-off area.
– Phase 3: Construction of a 40,000 square foot warehouse and unloading dock.

Other

Construction management project

Client

Hypertec

Localisation

Ville St-Laurent

Year(s)

2015

Architect(s)

Rucoolo et Faubert Architectes Inc.

Mechanical/electrical engineer

MSI