Water pump station of Terrebonne

Construction of a drinking water reservoir and a booster station for the city of Terrebonne, all aimed at providing the sector with a reserve of 5 000 m³ of drinking water.

Special features

– Construction done 2 meters below groundwater level.
– Complex formworks
– Considerable amount of mechanical process

Other

Lump sum project

Client

Régie de l'Aqueduc Intermunicipale des Moulins (RAIM)

Localisation

Terrebonne

Year(s)

2010 - 2011

Architect(s)

Viau Architectes & Associés

Structural engineer

CLA

Civil engineer

BPR Triax

Mechanical/electrical engineer

BPR Triax